A pipeline's order comes from its CFG_TASK_DEPENDENCY rows, never from code. Each row says that a task waits on an upstream task, and which outcome of that upstream it waits for.

Dependency types

DEPENDENCY_TYPE Satisfied when the upstream task is
SUCCESS SUCCESS
FAILURE FAILED, for example an email alert that reports a failure
ALWAYS finished in any way: SUCCESS, FAILED or SKIPPED
HAS_DATA SUCCESS and wrote at least one row

An upstream that has not run yet, or is still IN-PROGRESS, satisfies no dependency.

"Wrote" means inserted, updated or deleted, as AUD_TASK_RUN_LOG.ROWS_WRITTEN records: an APPEND_TABLE of no rows, or a merge that changed nothing, does not satisfy HAS_DATA however many rows its target holds. An ingestion script's row_count is the rows it wrote. A row recorded before ROWS_WRITTEN existed is judged by its TARGET_COUNT.

Run conditions

CFG_TASKS.RUN_CONDITION sets how many of a task's dependencies must be satisfied before it starts. It counts every dependency of the task, including those on tasks in other pipelines.

RUN_CONDITION The task starts when
empty or ALL every dependency is satisfied
ANY at least one dependency is satisfied
N at least RUN_CONDITION_COUNT dependencies are satisfied

RUN_CONDITION_COUNT is set only with N, must be at least 1, and cannot exceed the task's number of dependencies, since the task could then never start.

Waves

The engine checks the graph before a run: a task that depends on itself, a dependency on a task that does not exist, and a cycle are all errors, each with its own exit status. The dependencies of an inactive task are ignored; an active task that depends on an inactive one in the same pipeline is an error, since it could never run. etl-craft graph shows the pipeline as waves, where each wave depends only on earlier ones. Waves are the guaranteed-safe order: an ANY or N task appears after all its upstreams, even though it may start sooner during a run.

During a run

This section is local mode, where etl-craft is the orchestrator. In remote mode the orchestrator applies these rules instead, from the DAGs generate-yml writes; see Running under an orchestrator.

The engine starts every task that is ready, runs it, and looks again, until nothing is left to start.

  • Ready: a task is ready when it has not run under the active run, or it FAILED, and its run condition is met.
  • Retries resume: a task that is SUCCESS or SKIPPED never runs again under the same run, and one that is IN-PROGRESS is not started twice.
  • Skipped: a task that can never become ready is recorded SKIPPED. This happens when too many of its upstreams are SUCCESS or SKIPPED without satisfying their dependency: a FAILURE dependency on a task that succeeded, for example. Skipping cascades: a task that waits for the skipped task's SUCCESS is skipped too, while an ALWAYS dependency on it is satisfied.
  • A failed upstream is not final while the run goes on: a retry may still turn it into SUCCESS, so its dependents wait rather than being skipped. Once nothing else can start, no retry will come in this run, so the tasks waiting on the failure are recorded SKIPPED, and those that wait on them with ALWAYS or FAILURE, such as an alert, then run. The run ends FAILED, and its summary names the tasks skipped because of the failure.

Dependencies on tasks in other pipelines are checked when the task itself starts, so they never cause a task to be skipped before it runs.

Dependencies on other pipelines

A pipeline can depend on another pipeline (CFG_PIPELINE_DEPENDENCY), and a task on a task in another pipeline (a CFG_TASK_DEPENDENCY row whose DEPENDS_ON_PIPELINE_ID is another pipeline). A pipeline's dependencies are checked before a new run of it starts; a task's, before the task runs.

  1. Wait for a running upstream. While the upstream's latest run is IN-PROGRESS, the check waits for it. It looks again at 70% of the upstream's average run length, then 80%, 90% and so on; one check waits at most Orchestration.Gate_wait_minutes (an hour unless set; 0 judges at once) and looks at most 30 times, across all its dependencies.
  2. The last run decides. The upstream's latest finished run must satisfy the dependency type, just as within a pipeline. An older run that would have satisfied it does not count: if the upstream succeeded yesterday and failed today, a SUCCESS dependency is not satisfied.
  3. Consumption uses the admission decision. A gate records each dependency it judges in AUD_GATE_DECISIONS, with the selected upstream run, published output revision, result, reason and decision time. Pipeline decisions are recorded with run creation; task decisions are recorded with attempt admission. A successful downstream consumes only its recorded SATISFIED decisions. Reopening an upstream, completing a newer run, or changing dependency metadata while the downstream runs cannot change what that downstream consumes.
  4. Repairs can be fresh output. A higher upstream run id is new. The same run id is new only when its published OUTPUT_REVISION is higher and this dependency has CONSUME_REPAIRS = 'Y' (the default on both dependency tables). Set it to N when the dependency should accept only new run identities. An older run id never becomes new merely by gaining a higher revision.

A run starts at output revision 1. Reopening it sets REPAIR_PENDING = 'Y'; a successful ending publishes the repair by incrementing the revision once and clearing the flag. A failed or cancelled repair does not publish a revision. Cross-pipeline task decisions use their task run identity and the containing pipeline's published output revision.

AUD_DEPENDENCY_CONSUMPTION records the selected upstream identity and revision. Failed or skipped downstream work consumes nothing; bypassed decisions also consume nothing. Pipeline retries resume with their original admission decisions, while a retried task receives decisions for its new attempt. Skipped tasks can retain an unsatisfied decision without an execution attempt.

Orchestration.Dependency_gates: warn or off relaxes these checks per profile, recording each bypass; see Relax dependency gates.

A pipeline whose dependencies are not satisfied has its run recorded SKIPPED. A task whose dependencies on other pipelines are not satisfied is recorded SKIPPED too, unless an upstream in its own pipeline has not finished yet. SKIPPED is final for that run: the task does not run until a new run finds its dependencies satisfied. A run whose tasks were all skipped ends SKIPPED itself, so a pipeline that depends on it with SUCCESS is skipped in turn.

In remote mode none of this is checked by etl-craft and no tracker moves: the orchestrator's sensors wait for the upstream instead (see Running under an orchestrator).

A successful pipeline ending records its status, SLA result and admitted pipeline-dependency consumption in one Engine DB transaction. A successful task attempt records its outcome, summary, offset and admitted task-dependency consumption together. A crash before either commit leaves none of those ending writes; after the commit, it leaves all of them. Finalization hooks run after the pipeline transaction commits.